Apton Hall, Essex Solar PV and Battery Storage Installation

Project Overview

Having first worked with Apton Hall more than a decade ago to install a biomass boiler, the venue once again turned to renewable energy as part of its long-term sustainability strategy. The latest project involved the installation of a 143kWp solar PV system and 50kWh of battery storage, helping the site increase its use of clean, on-site generated electricity while reducing reliance on grid power.

Project Scope

Located in Rochford, Essex, the installation includes 308 solar panels alongside battery storage technology designed to maximise the value of the energy generated throughout the day. By storing surplus electricity for use during periods of higher demand, the system improves energy efficiency and reduces the need to import electricity from the grid.

The Challenge

As a busy events and wedding venue, Apton Hall required a renewable energy solution that could be installed with minimal disruption to day-to-day operations and scheduled events. The system needed to deliver long-term energy savings while supporting the venue’s environmental objectives.

The Solution

A tailored solar PV and battery storage system was designed to suit the site’s energy profile and available roof space. The 143kWp installation provides significant on-site renewable generation, while the 50kWh battery storage system helps optimise energy use by storing excess electricity for later consumption.

The project represents the next stage in Apton Hall’s renewable energy journey and demonstrates a continued commitment to sustainability. Building on a successful partnership spanning more than 10 years, the installation will help reduce energy costs, lower carbon emissions and improve energy resilience for years to come.